{"id":5859,"date":"2024-08-09T11:00:00","date_gmt":"2024-08-09T11:00:00","guid":{"rendered":"https:\/\/es.venngage.com\/blog\/?p=5859"},"modified":"2024-08-08T18:32:59","modified_gmt":"2024-08-08T18:32:59","slug":"cronograma-de-actividades","status":"publish","type":"post","link":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/","title":{"rendered":"+15 plantillas de cronograma de actividades editables para usar en Word y PowerPoint"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"576\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Header-plantillas-de-cronograma.png\" alt=\"Header para la entrada sobre plantillas de cronograma para word y powerpoint\" class=\"wp-image-8940\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Header-plantillas-de-cronograma.png 1024w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Header-plantillas-de-cronograma-300x169.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Header-plantillas-de-cronograma-768x432.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Header-plantillas-de-cronograma-730x411.png 730w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n<p>Cuando los proyectos descarrilan, a menudo se debe a una falta de organizaci\u00f3n. La mayor\u00eda de las empresas y gestores de proyectos conf\u00edan en los plazos de los proyectos. Desgraciadamente, las plantillas de cronograma de proyectos de muchas herramientas ofim\u00e1ticas comunes pueden limitar la creatividad y el compromiso del equipo. Un cronograma en blanco puede ser una herramienta esencial para la planificaci\u00f3n de proyectos, permitiendo a los usuarios esbozar las actividades y visualizar el calendario.<\/p>\n\n\n\n<p>Pero los usuarios de Venngage pueden tener lo mejor de todos los mundos creando atractivas plantillas de cronogramas de proyectos e infograf\u00edas que pueden exportar y utilizar en otros programas como Microsoft Office Word y PowerPoint.<\/p>\n\n\n\n<p>Con&nbsp;<a href=\"https:\/\/venngage.com\/blog\/business\">Venngage para empresas<\/a>, los usuarios pueden colaborar en tiempo real con otros miembros del equipo y exportar archivos de imagen para PowerPoint y Word. Y nuestra nueva funci\u00f3n inteligente de nuestro creador de&nbsp;<a href=\"https:\/\/es.venngage.com\/features\/hacer-linea-de-tiempo\">l\u00ednea de tiempo<\/a>&nbsp;puede ayudarte a ahorrar a\u00fan m\u00e1s tiempo ajustando autom\u00e1ticamente el contenido cuando hagas cambios.<\/p>\n\n\n\n<p>Veamos algunos consejos para crear un calendario del proyecto y compartamos inspiraci\u00f3n de dise\u00f1o para hacer fluir tu creatividad.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/features\/hacer-linea-de-tiempo\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>EMPIEZA A CREAR GRATIS<\/b><\/button><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 es un cronograma de proyecto?<\/h2>\n\n\n\n<p>Un cronograma de proyecto es una herramienta que detalla las actividades, tareas y plazos necesarios para completar un proyecto de manera efectiva. Act\u00faa como un mapa que gu\u00eda a los equipos a trav\u00e9s de cada fase del proyecto, asegurando que todos est\u00e9n alineados con los objetivos y tiempos establecidos.<\/p>\n\n\n\n<p>Un cronograma de proyecto efectivo debe contar con varios elementos clave para garantizar una planificaci\u00f3n y seguimiento \u00f3ptimos. A continuaci\u00f3n, se describen los elementos esenciales:<\/p>\n\n\n\n<ol>\n<li><strong>Actividades<\/strong>: Deben estar claramente definidas y desglosadas en tareas espec\u00edficas para facilitar el seguimiento.<\/li>\n\n\n\n<li><strong>Fechas de inicio y finalizaci\u00f3n<\/strong>: Cada actividad debe tener asignadas fechas que indiquen cu\u00e1ndo comienza y cu\u00e1ndo debe completarse, lo que ayuda a establecer plazos claros.<\/li>\n\n\n\n<li><strong>Responsables<\/strong>: Es crucial asignar un responsable a cada tarea, lo que fomenta la rendici\u00f3n de cuentas y asegura que todos sepan sus responsabilidades.<\/li>\n\n\n\n<li><strong>Duraci\u00f3n<\/strong>: Incluir estimaciones de tiempo para cada actividad permite planificar adecuadamente los recursos.<\/li>\n\n\n\n<li><strong>Estado de las tareas<\/strong>: Un indicador actualizado del progreso de cada actividad, como \u201cpendiente\u201d, \u201cen progreso\u201d o \u201ccompletado\u201d, facilita la evaluaci\u00f3n continua del proyecto.<\/li>\n\n\n\n<li><strong>Hitos<\/strong>: Identificar hitos importantes en el cronograma ayuda a medir el \u00e9xito del avance del proyecto y a celebrar logros clave.<\/li>\n\n\n\n<li><strong>Recursos<\/strong>: Una lista de recursos necesarios, incluyendo tanto humanos como materiales, optimiza la gesti\u00f3n y la asignaci\u00f3n de capacidades. Aunque usar una hoja de c\u00e1lculo para crear cronogramas de proyectos es accesible y f\u00e1cil de usar, su efectividad depende del conocimiento del usuario sobre reglas y f\u00f3rmulas, lo que puede limitar su uso para un grupo selecto de personas.<\/li>\n<\/ol>\n\n\n\n<p>Utilizar un gr\u00e1fico como este facilita la visualizaci\u00f3n del progreso del proyecto, ayuda a identificar cuellos de botella y asegura que los plazos se cumplan. Con un buen cronograma, los equipos pueden colaborar m\u00e1s eficazmente y reducir el riesgo de retrasos o malentendidos durante la ejecuci\u00f3n del proyecto.<\/p>\n\n\n\n<p>Veamos algunos consejos para crear un calendario del proyecto y compartamos inspiraci\u00f3n de dise\u00f1o para hacer fluir tu creatividad.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"toc\"><strong>Haz clic para avanzar:<\/strong><\/h3>\n\n\n\n<ul>\n<li><a href=\"#1\">\u00bfC\u00f3mo se elabora el calendario de un proyecto?<\/a><\/li>\n\n\n\n<li><a href=\"#2\">\u00bfQu\u00e9 es una plantilla de cronograma de proyecto?<\/a><\/li>\n\n\n\n<li><a href=\"#3\">Ejemplos de plazos de proyectos<\/a><\/li>\n\n\n\n<li><a href=\"#4\">Ejemplos de cronolog\u00eda en PowerPoint<\/a><\/li>\n\n\n\n<li><a href=\"#5\">Plantillas de cronograma de proyectos para PowerPoint<\/a><\/li>\n\n\n\n<li><a href=\"#6\">Ejemplo de l\u00ednea de tiempo<\/a><\/li>\n\n\n\n<li><a href=\"#7\">Plantillas de cronograma de proyectos para Word<\/a><\/li>\n\n\n\n<li><a href=\"#8\">Plantillas de plazos para la gesti\u00f3n de proyectos<\/a><\/li>\n\n\n\n<li><a href=\"#9\">Plantillas de hitos del proyecto<\/a><\/li>\n\n\n\n<li><a href=\"#10\">Plantillas sencillas de cronograma de proyectos<\/a><\/li>\n\n\n\n<li><a href=\"#11\">Plantillas de plazos de construcci\u00f3n<\/a><\/li>\n\n\n\n<li><a href=\"#12\">Plantillas de calendario<\/a><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1\"><strong>\u00bfC\u00f3mo se elabora el calendario de un proyecto?<\/strong><\/h2>\n\n\n\n<p>En los proyectos grandes y peque\u00f1os, resolver el calendario suele ser el primer trabajo y el m\u00e1s importante. Si el equipo no conoce el plazo o cu\u00e1ndo deben realizarse determinadas tareas del proyecto, hay pocas posibilidades de que lo terminen a tiempo o dentro del presupuesto.<\/p>\n\n\n\n<p>No hay una \u00fanica forma de hacer un cronograma de un proyecto, pero los dos m\u00e9todos m\u00e1s comunes son ir de principio a fin o trabajar hacia atr\u00e1s. \u00bfCu\u00e1l es la diferencia?<\/p>\n\n\n\n<ul>\n<li><strong>De principio a fin<\/strong>: Si sabes cu\u00e1nto tiempo llevar\u00e1 cada paso del proyecto pero no tienes un plazo, calcula los plazos de las tareas en funci\u00f3n del tiempo que llevar\u00e1 cada paso. Trabaja hasta el final del proyecto, y tendr\u00e1s un cronograma del proyecto completo.<\/li>\n\n\n\n<li><strong>Trabaja hacia atr\u00e1s<\/strong>: Si el plazo ya est\u00e1 establecido, empieza por ah\u00ed y ve retrocediendo para averiguar cu\u00e1ndo hay que hacer cada tarea para cumplir ese plazo.<\/li>\n<\/ul>\n\n\n\n<p>Este calendario del proyecto, por ejemplo, no se cre\u00f3 con un plazo concreto en mente.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/strategy-project-timeline-e19e1429-f820-45ee-8d93-e056c551f0ad\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-horizontal.png\" alt=\"Infograf\u00eda de l\u00ednea de tiempo horizontal\" class=\"wp-image-5861\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-horizontal.png 1632w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-horizontal-300x194.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-horizontal-1024x663.png 1024w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-horizontal-768x497.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-horizontal-1536x994.png 1536w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-horizontal-730x472.png 730w\" sizes=\"(max-width: 1632px) 100vw, 1632px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/strategy-project-timeline-e19e1429-f820-45ee-8d93-e056c551f0ad\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>En su lugar, cada segmento del proyecto incluye una estimaci\u00f3n de cu\u00e1nto tiempo se ha asignado para su finalizaci\u00f3n. La adici\u00f3n de una sencilla visualizaci\u00f3n de datos ayuda a todos los implicados a ver claramente las tareas que requerir\u00e1n la mayor parte del tiempo.<\/p>\n\n\n\n<p>Independientemente de c\u00f3mo crees el calendario de tu proyecto, debes intentar que se parezca al ejemplo anterior, aunque, como ver\u00e1s, no es la \u00fanica forma de hacerlo. Tambi\u00e9n puedes utilizar plantillas de cronogramas en Excel para la planificaci\u00f3n estrat\u00e9gica, lo que facilita la organizaci\u00f3n de tareas, hitos y objetivos de proyectos.<\/p>\n\n\n\n<p><strong>Relacionado<\/strong>:\u00a0<a href=\"https:\/\/es.venngage.com\/blog\/como-hacer-una-linea-de-tiempo\/\" target=\"_blank\" rel=\"noreferrer noopener\">C\u00f3mo crear una infograf\u00eda cronol\u00f3gica: La gu\u00eda definitiva<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2\"><strong>\u00bfQu\u00e9 es una plantilla de cronograma de proyecto?<\/strong><\/h2>\n\n\n\n<p>Una vez que hayas conseguido que un proyecto se desarrolle sin problemas y con \u00e9xito con la ayuda de un cronograma de proyecto, deber\u00edas plantearte crear una plantilla a partir de \u00e9l.<\/p>\n\n\n\n<p>La forma m\u00e1s sencilla de hacerlo es abrir la l\u00ednea de tiempo en Venngage o en la herramienta que est\u00e9s utilizando y eliminar las fechas y tareas relevantes. Luego vuelve a guardar el archivo, asegur\u00e1ndote de ponerle un nombre relacionado con \u201cplantilla\u201d.<\/p>\n\n\n\n<p>O mejor a\u00fan, tienes la opci\u00f3n de guardar un dise\u00f1o que te guste como plantilla cuando&nbsp;<a href=\"https:\/\/venngage.com\/blog\/business\">pases a Business<\/a>:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"852\" height=\"504\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Hacer-plantillas-en-Venngage.png\" alt=\"Captura de pantalla de c\u00f3mo hacer plantillas en Venngage\" class=\"wp-image-8939\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Hacer-plantillas-en-Venngage.png 852w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Hacer-plantillas-en-Venngage-300x177.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Hacer-plantillas-en-Venngage-768x454.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Hacer-plantillas-en-Venngage-730x432.png 730w\" sizes=\"(max-width: 852px) 100vw, 852px\" \/><\/figure><\/div>\n\n\n<p>De ese modo, s\u00f3lo tienes que a\u00f1adir las nuevas fechas y reutilizar la l\u00ednea de tiempo del proyecto una y otra vez. As\u00ed tendr\u00e1s una biblioteca de&nbsp;<a href=\"https:\/\/es.venngage.com\/blog\/linea-de-tiempo-diseno-ejemplos\/\" target=\"_blank\" rel=\"noreferrer noopener\">plantillas de cronogramas<\/a>&nbsp;que te han funcionado y podr\u00e1s decidir qu\u00e9 tipo utilizar para cada nuevo proyecto.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/client-project-timeline-infographic-f7fb5355-b0ee-4b3b-ac8a-eb545d233a15\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-proyecto-del-cliente.png\" alt=\"Plantilla de infograf\u00eda de l\u00ednea de tiempo del proyecto del cliente\" class=\"wp-image-5863\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-proyecto-del-cliente.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-proyecto-del-cliente-134x300.png 134w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-proyecto-del-cliente-457x1024.png 457w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-proyecto-del-cliente-768x1722.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-proyecto-del-cliente-685x1536.png 685w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-proyecto-del-cliente-730x1637.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/client-project-timeline-infographic-f7fb5355-b0ee-4b3b-ac8a-eb545d233a15\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Esta sencilla plantilla de cronograma abarca un total de nueve semanas, pero puedes modificarla f\u00e1cilmente para aplicarla a los plazos m\u00e1s habituales en tus proyectos. Actualiza r\u00e1pidamente el contenido y los iconos para que se adapte a tu sector.<\/p>\n\n\n\n<p><strong>Relacionado<\/strong>:&nbsp;<a href=\"https:\/\/es.venngage.com\/blog\/linea-de-tiempo-diseno-ejemplos\/\" target=\"_blank\" rel=\"noreferrer noopener\">40+ Ejemplos de plantillas de cronogramas y consejos de dise\u00f1o<\/a><\/p>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3\"><strong>Ejemplos de plazos de proyectos<\/strong><\/h2>\n\n\n\n<p>Veamos un par de ejemplos de plazos de proyectos para ver c\u00f3mo pueden aplicarse a distintos tipos de proyectos, tanto largos como cortos.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/monthly-project-milestones-timeline-infographic-5b823582-70f1-4ad0-8d36-8946eae0a12d\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-hitos-de-proyectos-mensuales.png\" alt=\"Plantilla de infograf\u00eda de l\u00ednea de tiempo de hitos de proyectos mensuales\" class=\"wp-image-5864\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-hitos-de-proyectos-mensuales.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-hitos-de-proyectos-mensuales-113x300.png 113w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-hitos-de-proyectos-mensuales-384x1024.png 384w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-hitos-de-proyectos-mensuales-768x2048.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-hitos-de-proyectos-mensuales-576x1536.png 576w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-hitos-de-proyectos-mensuales-730x1946.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/monthly-project-milestones-timeline-infographic-5b823582-70f1-4ad0-8d36-8946eae0a12d\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Esta l\u00ednea de tiempo del proyecto cubre todo un a\u00f1o de hitos importantes. \u00bfNo necesitas 12 meses completos de entradas? S\u00f3lo tienes que modificar el dise\u00f1o para adaptarlo al calendario de tus proyectos.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/product-release-58d8ca48-9682-43a7-8fff-006f878f18f0\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"700\" height=\"906\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Cronograma-de-desarrollo-de-productos.png\" alt=\"Cronograma de desarrollo de productos\" class=\"wp-image-5865\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Cronograma-de-desarrollo-de-productos.png 700w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Cronograma-de-desarrollo-de-productos-232x300.png 232w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/product-release-58d8ca48-9682-43a7-8fff-006f878f18f0\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Dividir las grandes tareas en trozos m\u00e1s peque\u00f1os puede evitar que la gente se agobie. Es un m\u00e9todo llamado&nbsp;microproductividad, y si tu equipo se enfrenta a una tarea enorme, utiliza un calendario de proyecto como \u00e9ste para ayudarles a mantener los ojos en la pelota.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4\"><strong>Ejemplos de cronolog\u00eda en PowerPoint<\/strong><\/h2>\n\n\n\n<p>PowerPoint sigue siendo la herramienta de presentaci\u00f3n m\u00e1s com\u00fan en la mayor\u00eda de los lugares de trabajo. Pero las l\u00edneas de tiempo, las hojas de ruta y los elementos visuales relacionados no son precisamente el fuerte de PowerPoint.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Ejemplos-de-linea-de-tiempo-de-PowerPoint-1.png\" alt=\"Ejemplos de l\u00ednea de tiempo de PowerPoint\" class=\"wp-image-5867\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Ejemplos-de-linea-de-tiempo-de-PowerPoint-1.png 796w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Ejemplos-de-linea-de-tiempo-de-PowerPoint-1-300x170.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Ejemplos-de-linea-de-tiempo-de-PowerPoint-1-768x434.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Ejemplos-de-linea-de-tiempo-de-PowerPoint-1-730x413.png 730w\" sizes=\"(max-width: 796px) 100vw, 796px\" \/><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/templates.office.com\/en-us\/quarterly-product-roadmap-timeline-tm44823434\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Fuente<\/a><\/p>\n\n\n\n<p>Este ejemplo de&nbsp;<a href=\"https:\/\/es.venngage.com\/template\/timeline\" target=\"_blank\" rel=\"noreferrer noopener\">plantilla de cronograma de PowerPoint<\/a>&nbsp;muestra lo sencillas que son las herramientas visuales integradas en el programa. Aunque funcional, es dif\u00edcil decir que este cronograma de proyecto sea muy atractivo.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-linea-de-tiempo-de-PowerPoint.png\" alt=\"Plantilla de l\u00ednea de tiempo de PowerPoint\" class=\"wp-image-5868\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-linea-de-tiempo-de-PowerPoint.png 796w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-linea-de-tiempo-de-PowerPoint-300x170.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-linea-de-tiempo-de-PowerPoint-768x434.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-linea-de-tiempo-de-PowerPoint-730x413.png 730w\" sizes=\"(max-width: 796px) 100vw, 796px\" \/><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/templates.office.com\/en-us\/three-month-weekly-timeline-tm01016262\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Fuente<\/a><\/p>\n\n\n\n<p>Este plazo de tres meses del proyecto es otro ejemplo de hasta qu\u00e9 punto PowerPoint lucha cuando se trata de proporcionar herramientas s\u00f3lidas para crear im\u00e1genes emocionantes y visualmente atractivas.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"5\"><strong>Plantillas de cronograma de proyectos para PowerPoint<\/strong><\/h2>\n\n\n\n<p>Un usuario de pago de Venngage tiene la opci\u00f3n de descargar el dise\u00f1o de su l\u00ednea de tiempo del proyecto en PNG o PNG HD, que puede a\u00f1adir a sus diapositivas de PowerPoint como una imagen.<\/p>\n\n\n\n<p>Una vez que te hayas actualizado a&nbsp;<a href=\"https:\/\/venngage.com\/blog\/business\" target=\"_blank\" rel=\"noreferrer noopener\">Venngage para empresas<\/a>, podr\u00e1s descargar tus plantillas de cronograma de proyectos en formato PowerPoint, que podr\u00e1s abrir, editar y presentar a trav\u00e9s de PowerPoint. Si prefieres editar las l\u00edneas de tiempo de tus proyectos en Venngage, siempre puedes volver atr\u00e1s, editarlas y exportarlas de nuevo como archivo .pptx.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"960\" height=\"504\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/02\/Captura-de-pantalla-Venngage.png\" alt=\"Captura de pantalla de Venngage para descargar\" class=\"wp-image-8885\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/02\/Captura-de-pantalla-Venngage.png 960w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/02\/Captura-de-pantalla-Venngage-300x158.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/02\/Captura-de-pantalla-Venngage-768x403.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/02\/Captura-de-pantalla-Venngage-730x383.png 730w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure><\/div>\n\n\n<p>Ten en cuenta la orientaci\u00f3n de las diapositivas de las plantillas de PowerPoint que tenga tu empresa. El programa tiene por defecto una vista horizontal, pero tambi\u00e9n es posible&nbsp;cambiar a un&nbsp;dise\u00f1o&nbsp;vertical.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/school-project-timeline-assignment-infographic-aa21469f-e340-4737-be69-56459c0a21ac\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-asignacion-de-linea-de-tiempo-de-proyecto-escolar.png\" alt=\"Plantilla de infograf\u00eda de asignaci\u00f3n de l\u00ednea de tiempo de proyecto escolar\" class=\"wp-image-5870\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-asignacion-de-linea-de-tiempo-de-proyecto-escolar.png 1632w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-asignacion-de-linea-de-tiempo-de-proyecto-escolar-300x194.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-asignacion-de-linea-de-tiempo-de-proyecto-escolar-1024x663.png 1024w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-asignacion-de-linea-de-tiempo-de-proyecto-escolar-768x497.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-asignacion-de-linea-de-tiempo-de-proyecto-escolar-1536x994.png 1536w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-asignacion-de-linea-de-tiempo-de-proyecto-escolar-730x472.png 730w\" sizes=\"(max-width: 1632px) 100vw, 1632px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/school-project-timeline-assignment-infographic-aa21469f-e340-4737-be69-56459c0a21ac\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Esta plantilla de l\u00ednea de tiempo horizontal es ideal para la mayor\u00eda de las presentaciones de PowerPoint. Si el estilo de presentaci\u00f3n en PowerPoint de tu empresa incluye alguna marca incorporada, como un logotipo u otro material en cada p\u00e1gina, basta con que quites la barra de la parte inferior para que quede perfecta.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/project-timeline-9a48e8ba-db0b-4a39-8942-1ab7cfe13ff3\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-proyecto.png\" alt=\"Infograf\u00eda de la l\u00ednea de tiempo del proyecto\" class=\"wp-image-5871\" width=\"700\" height=\"1569\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-proyecto.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-proyecto-134x300.png 134w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-proyecto-457x1024.png 457w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-proyecto-768x1722.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-proyecto-685x1536.png 685w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-proyecto-730x1637.png 730w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/project-timeline-9a48e8ba-db0b-4a39-8942-1ab7cfe13ff3\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Aunque esta plantilla de <a href=\"https:\/\/venngage.com\/blog\/vertical-timeline\/\" target=\"_blank\" rel=\"noreferrer noopener\">l\u00ednea de tiempo vertical<\/a>&nbsp;puede resultar un poco alta aunque cambies la orientaci\u00f3n de las diapositivas, es f\u00e1cil imaginar c\u00f3mo un dise\u00f1o de l\u00ednea de tiempo como \u00e9ste puede ayudar a que tu informaci\u00f3n destaque.<\/p>\n\n\n\n<p>Ir a contracorriente suele ser \u00fatil, ya que rompe las expectativas de la gente y puede hacer que tu informaci\u00f3n sea m\u00e1s memorable.<\/p>\n\n\n\n<p><strong>Relacionados<\/strong>:\u00a0<a href=\"https:\/\/venngage.com\/blog\/powerpoint-timeline-template\/\" target=\"_blank\" rel=\"noreferrer noopener\">25+ Plantillas de l\u00ednea de tiempo en PowerPoint f\u00e1ciles de editar<\/a> <em>(en ingl\u00e9s)<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"6\"><strong>Ejemplos de l\u00ednea del tiempo<\/strong><\/h2>\n\n\n\n<p>El programa hermano de PowerPoint, Microsoft Word, es una herramienta a\u00fan peor para crear gr\u00e1ficos. No es culpa de Word; al fin y al cabo, es un programa de tratamiento de textos, no una herramienta de dise\u00f1o gr\u00e1fico. A\u00fan as\u00ed, es t\u00e9cnicamente posible crear una l\u00ednea de tiempo del proyecto en Word.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"600\" height=\"462\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Ejemplos-de-linea-de-tiempo-de-Word.png\" alt=\"Ejemplos de l\u00ednea de tiempo de Word\" class=\"wp-image-5872\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Ejemplos-de-linea-de-tiempo-de-Word.png 600w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Ejemplos-de-linea-de-tiempo-de-Word-300x231.png 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/templates.office.com\/en-us\/timeline-tm01016265\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Fuente<\/a><\/p>\n\n\n\n<p>Esta plantilla de cronograma de proyecto para Word hace que los ejemplos de PowerPoint que compartimos parezcan algo que deber\u00eda estar colgado en el Louvre. En realidad, ni Word ni PowerPoint son herramientas de dise\u00f1o gr\u00e1fico, y por eso utilizarlas para crear elementos visuales emocionantes y atractivos es una tonter\u00eda en muchos casos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"7\"><strong>Plantillas de cronograma de proyectos para Word<\/strong><\/h2>\n\n\n\n<p>Aunque desaconsejamos el uso de Word como herramienta de dise\u00f1o o presentaci\u00f3n, muchas organizaciones lo utilizan para redactar res\u00famenes de proyectos o incluso para redactar contratos. Por estas razones, suele ser \u00fatil incluir un calendario del proyecto en un documento de Word.<\/p>\n\n\n\n<p><a href=\"https:\/\/es.venngage.com\/features\/hacer-linea-de-tiempo\" target=\"_blank\" rel=\"noreferrer noopener\">El Creador de cronogramas<\/a>&nbsp;de Venngage ofrece muchas plantillas de cronogramas de proyectos que pueden utilizarse para Word. S\u00f3lo tienes que entrar en Venngage, crear una l\u00ednea de tiempo del proyecto y guardarla como una imagen que luego puedes cargar en tu documento de Word.<\/p>\n\n\n\n<p>El tama\u00f1o de documento por defecto de Word es carta, es decir, 8,5 por 11 pulgadas. Al igual que con PowerPoint, es posible cambiarlo, pero la mayor\u00eda de las empresas que utilizan Word se quedan con la orientaci\u00f3n carta est\u00e1ndar.<\/p>\n\n\n\n<p>Con un&nbsp;margen est\u00e1ndar de 2,5 cm&nbsp;en todos los lados, eso significa que una plantilla de cronograma de proyecto para Word tendr\u00eda un m\u00e1ximo de 624 por 864 p\u00edxeles, o 6,5 por 9 pulgadas.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/simple-timeline-5406a671-7840-41c3-8412-ec83e7ab500b\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-simple.png\" alt=\"Infograf\u00eda de l\u00ednea de tiempo simple\" class=\"wp-image-5873\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-simple.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-simple-232x300.png 232w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-simple-791x1024.png 791w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-simple-768x994.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-simple-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/simple-timeline-5406a671-7840-41c3-8412-ec83e7ab500b\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Esta sencilla plantilla de cronograma de proyecto para Word quedar\u00eda muy bien en una p\u00e1gina completa de un contrato, una propuesta u otros documentos corporativos. A\u00f1ade fechas para asegurarte de que todos los miembros del equipo conocen los plazos clave.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/planning-process-healthcare-timeline-93253699-bde3-4303-aaad-e2e5162bf2a9\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-atencion-medica-del-proceso-de-planificacion.png\" alt=\"Plantilla de infograf\u00eda de l\u00ednea de tiempo de atenci\u00f3n m\u00e9dica del proceso de planificaci\u00f3n\" class=\"wp-image-5874\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-atencion-medica-del-proceso-de-planificacion.png 1056w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-atencion-medica-del-proceso-de-planificacion-300x232.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-atencion-medica-del-proceso-de-planificacion-1024x791.png 1024w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-atencion-medica-del-proceso-de-planificacion-768x593.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-atencion-medica-del-proceso-de-planificacion-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/planning-process-healthcare-timeline-93253699-bde3-4303-aaad-e2e5162bf2a9\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Esta plantilla de cronograma de proyecto para Word ocupar\u00eda aproximadamente media p\u00e1gina est\u00e1ndar, lo que significa que tendr\u00edas espacio para contenido adicional si lo necesitas. Eso puede ser \u00fatil si la l\u00ednea de tiempo incluye elementos que necesitan una explicaci\u00f3n m\u00e1s detallada.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"8\"><strong>Plantillas de plazos para la gesti\u00f3n de proyectos<\/strong><\/h2>\n\n\n\n<p>Los gestores de proyectos deben mantener todos los platos girando, ya que se aseguran de que no quede ning\u00fan detalle sin contar al final de un proyecto. Por eso las plantillas de cronogramas de gesti\u00f3n de proyectos deben abarcar desde el nivel m\u00e1s alto hasta el m\u00e1s detallado.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/project-timeline-e359ed12-ff07-456a-92ef-bb6250dc11b0\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-de-marketing.png\" alt=\"Infograf\u00eda de l\u00ednea de tiempo de marketing\" class=\"wp-image-5875\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-de-marketing.png 1056w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-de-marketing-300x232.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-de-marketing-1024x791.png 1024w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-de-marketing-768x593.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-de-marketing-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/project-timeline-e359ed12-ff07-456a-92ef-bb6250dc11b0\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Utiliza una plantilla de cronograma de proyecto como la anterior al principio de las fases de planificaci\u00f3n de un proyecto. El enfoque amplio y general de este calendario puede ayudar a todos los miembros del equipo a comprender el alcance del proyecto.<\/p>\n\n\n\n<p>Y es especialmente \u00fatil en los casos en que el proyecto implique a un equipo externo, como un cliente, para que puedas establecer expectativas claras.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-plan-del-proyecto.png\" alt=\"Infograf\u00eda de la l\u00ednea de tiempo del plan del proyecto\" class=\"wp-image-5876\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-plan-del-proyecto.png 1632w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-plan-del-proyecto-300x194.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-plan-del-proyecto-1024x663.png 1024w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-plan-del-proyecto-768x497.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-plan-del-proyecto-1536x994.png 1536w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-del-plan-del-proyecto-730x472.png 730w\" sizes=\"(max-width: 1632px) 100vw, 1632px\" \/><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/project-timeline-b76bafe7-1cc5-468a-8004-97f59383b10d\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Las plantillas de cronograma de gesti\u00f3n de proyectos tambi\u00e9n son \u00fatiles por ser extremadamente detalladas. No todas las personas implicadas en el proyecto necesitan ver cada peque\u00f1o hito a lo largo del camino, pero para el gestor del proyecto, visualizar los pasos en un m\u00e9todo como la l\u00ednea temporal anterior es \u00fatil.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"9\"><strong>Plantillas de hitos del proyecto<\/strong><\/h2>\n\n\n\n<p>Tanto si las utilizas para PowerPoint, Word u otro programa, como si las utilizas solas, las plantillas de hitos del proyecto son herramientas \u00fatiles que debes tener a mano. Pueden ayudar a los equipos a comprender c\u00f3mo se dividen los proyectos en segmentos manejables.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/simple-blue-timeline-887d4fd2-61e2-4bf7-ae22-0bc4f30a394b\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-facil.png\" alt=\"Infograf\u00eda de l\u00ednea de tiempo f\u00e1cil\" class=\"wp-image-5877\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-facil.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-facil-175x300.png 175w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-facil-597x1024.png 597w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-facil-768x1318.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-facil-730x1252.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/simple-blue-timeline-887d4fd2-61e2-4bf7-ae22-0bc4f30a394b\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Considera la posibilidad de crear una plantilla de hitos del proyecto sin fechas ni plazos espec\u00edficos para cada segmento durante la fase de planificaci\u00f3n de un proyecto.<\/p>\n\n\n\n<p>Son \u00fatiles sobre todo cuando se trata de nuevos miembros del equipo o de incorporar a un nuevo cliente que a\u00fan no ha pasado por el proceso de planificaci\u00f3n del proyecto.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/8-week-sprint-be77bc0b-f744-4a9f-883e-01ba40a5f880\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-basica.png\" alt=\"Infograf\u00eda de l\u00ednea de tiempo b\u00e1sica\" class=\"wp-image-5878\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-basica.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-basica-117x300.png 117w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-basica-399x1024.png 399w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-basica-768x1969.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-basica-599x1536.png 599w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-basica-799x2048.png 799w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-linea-de-tiempo-basica-730x1872.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/8-week-sprint-be77bc0b-f744-4a9f-883e-01ba40a5f880\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>A\u00f1ade un elemento de tiempo sin proporcionar fechas o plazos concretos con un calendario de hitos del proyecto que se desglose por semanas, como hace \u00e9ste. Si eso no se aplica a tu proyecto, div\u00eddelo en d\u00edas, meses, trimestres o cualquier otra divisi\u00f3n temporal que te funcione.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"10\"><strong>Plantillas sencillas de cronograma de proyectos<\/strong><\/h2>\n\n\n\n<p>Muchos de los ejemplos de plantillas de cronogramas de proyectos que hemos compartido se inclinan hacia lo m\u00e1s detallado y complejo. Pero los calendarios de proyectos \u00fatiles tambi\u00e9n pueden ser bastante sencillos; a menudo, cuanto m\u00e1s sencillo es el dise\u00f1o, m\u00e1s eficaz resulta.<\/p>\n\n\n\n<figure class=\"wp-block-gallery aligncenter has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/higher-education-class-semester-timeline-infographic-e94d675e-1fdd-4bcd-90a6-86babeb97551\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"816\" height=\"1470\" data-id=\"5879\"  src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-semestre-de-clase-de-educacion-superior.png\" alt=\"Plantillas simples de cronograma de proyectos\" class=\"wp-image-5879\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-semestre-de-clase-de-educacion-superior.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-semestre-de-clase-de-educacion-superior-167x300.png 167w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-semestre-de-clase-de-educacion-superior-568x1024.png 568w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-semestre-de-clase-de-educacion-superior-768x1384.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-semestre-de-clase-de-educacion-superior-730x1315.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure>\n<\/figure>\n\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/higher-education-class-semester-timeline-infographic-e94d675e-1fdd-4bcd-90a6-86babeb97551\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Este sencillo cronograma de proyecto es ideal cuando tienes amplios intervalos de tiempo en los que se completar\u00e1n las tareas. Aunque se cre\u00f3 para servir como una especie de plan de estudios, es f\u00e1cil ver c\u00f3mo podr\u00eda personalizarse para tu proyecto.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/modern-simple-timeline-52b022c3-4359-4400-a646-f1deadbafac5\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-simple-moderna.png\" alt=\"Plantilla de infograf\u00eda de l\u00ednea de tiempo simple moderna\" class=\"wp-image-5880\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-simple-moderna.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-simple-moderna-232x300.png 232w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-simple-moderna-791x1024.png 791w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-simple-moderna-768x994.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-simple-moderna-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/modern-simple-timeline-52b022c3-4359-4400-a646-f1deadbafac5\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Las l\u00edneas de tiempo sencillas de un proyecto tambi\u00e9n pueden proporcionar una visi\u00f3n general de alto nivel del flujo de trabajo que se va a producir. En este caso, no se incluyen fechas ni siquiera intervalos de tiempo, aunque eso podr\u00eda a\u00f1adirse f\u00e1cilmente con unos pocos clics una vez que est\u00e9s en el editor de Venngage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"11\"><strong>Plantillas de plazos de construcci\u00f3n<\/strong><\/h2>\n\n\n\n<p>Incluso los peque\u00f1os proyectos de reformas dom\u00e9sticas pueden ser una pesadilla de planificaci\u00f3n, y los grandes proyectos de construcci\u00f3n son enormes desaf\u00edos log\u00edsticos. No es de extra\u00f1ar que el sector de la construcci\u00f3n sea uno de los mayores usuarios de plantillas de plazos.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/home-build-project-timeline-37d9e32f-3d59-4b51-af80-1b821359d197\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-de-la-construccion.png\" alt=\"Infograf\u00eda de la l\u00ednea de tiempo de la construcci\u00f3n\" class=\"wp-image-5882\" width=\"style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\"\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-de-la-construccion.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-de-la-construccion-115x300.png 115w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-de-la-construccion-393x1024.png 393w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-de-la-construccion-768x2003.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-de-la-construccion-589x1536.png 589w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-de-la-construccion-785x2048.png 785w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-la-linea-de-tiempo-de-la-construccion-730x1904.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/home-build-project-timeline-37d9e32f-3d59-4b51-af80-1b821359d197\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>El enorme volumen de piezas m\u00f3viles en un proyecto de construcci\u00f3n es asombroso. Por eso, ser incre\u00edblemente detallista y prescriptivo en cuanto al tiempo que llevar\u00e1 cada tarea puede hacer que te des cuenta de la necesidad de realizar las tareas dentro de esas restricciones de tiempo.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/5-stage-planning-process-hospital-timeline-318b4aab-a562-4e08-84a0-2f4c7f88cb4a\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-hospital-del-proceso-de-planificacion-de-5-etapas.png\" alt=\"Plantilla de infograf\u00eda de l\u00ednea de tiempo del hospital del proceso de planificaci\u00f3n de 5 etapas\" class=\"wp-image-5883\" width=\"700\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-hospital-del-proceso-de-planificacion-de-5-etapas.png 816w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-hospital-del-proceso-de-planificacion-de-5-etapas-232x300.png 232w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-hospital-del-proceso-de-planificacion-de-5-etapas-791x1024.png 791w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-hospital-del-proceso-de-planificacion-de-5-etapas-768x994.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-del-hospital-del-proceso-de-planificacion-de-5-etapas-730x945.png 730w\" sizes=\"(max-width: 816px) 100vw, 816px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/5-stage-planning-process-hospital-timeline-318b4aab-a562-4e08-84a0-2f4c7f88cb4a\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Las plantillas de cronogramas de construcci\u00f3n tambi\u00e9n son \u00fatiles cuando adoptan una visi\u00f3n a 10.000 pies. Este ejemplo ser\u00eda ideal para conversaciones con la direcci\u00f3n interna y externa, para que puedan ver c\u00f3mo encaja el trabajo actual con la planificaci\u00f3n a largo plazo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"12\"><strong>Plantillas de calendario<\/strong><\/h2>\n\n\n\n<p>Si tu proyecto requiere una planificaci\u00f3n detallada, hasta la fecha y hora en que algo debe suceder, considera la posibilidad de utilizar una plantilla de calendario cronol\u00f3gico. Son especialmente \u00fatiles en la planificaci\u00f3n de eventos, ya que pueden ayudar a los organizadores y participantes a visualizar los acontecimientos importantes.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/event-project-timeline-cd46dd16-186b-4b10-950b-b0679e643f29\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-cronograma-de-planificacion-de-eventos.png\" alt=\"Infograf\u00eda de cronograma de planificaci\u00f3n de eventos\" class=\"wp-image-5884\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-cronograma-de-planificacion-de-eventos.png 1056w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-cronograma-de-planificacion-de-eventos-300x232.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-cronograma-de-planificacion-de-eventos-1024x791.png 1024w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-cronograma-de-planificacion-de-eventos-768x593.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Infografia-de-cronograma-de-planificacion-de-eventos-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/es.venngage.com\/templates\/infographics\/event-project-timeline-cd46dd16-186b-4b10-950b-b0679e643f29\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Organiza todos los aspectos de tu evento con una plantilla de calendario cronol\u00f3gico. Aunque esta plantilla tiene en mente una convenci\u00f3n, puedes utilizar algo as\u00ed semanalmente para poner al d\u00eda al equipo sobre lo que se est\u00e1 haciendo en todo el proyecto.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/venngage.com\/templates\/infographics\/nonprofit-conference-events-timeline-75da5470-758e-4fe4-b04b-ca11dc640050\" target=\"_blank\" rel=\"noreferrer noopener\"><img decoding=\"async\" src=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-eventos-de-conferencias-sin-fines-de-lucro.png\" alt=\"Plantilla de infograf\u00eda de l\u00ednea de tiempo de eventos de conferencias sin fines de lucro\" class=\"wp-image-5885\" width=\"700\" style=\"box-shadow: 0 1px 4px 0 rgb(0 0 0 \/ 10%), 0 0 6px 0 rgb(0 0 0 \/ 10%), 0 2px 2px -2px rgb(0 0 0 \/ 15%);\" srcset=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-eventos-de-conferencias-sin-fines-de-lucro.png 1056w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-eventos-de-conferencias-sin-fines-de-lucro-300x232.png 300w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-eventos-de-conferencias-sin-fines-de-lucro-1024x791.png 1024w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-eventos-de-conferencias-sin-fines-de-lucro-768x593.png 768w, https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/Plantilla-de-infografia-de-linea-de-tiempo-de-eventos-de-conferencias-sin-fines-de-lucro-730x564.png 730w\" sizes=\"(max-width: 1056px) 100vw, 1056px\" \/><\/a><\/figure><\/div>\n\n\n<p><\/p>\n\n\n\n<p class=\"has-text-align-center\"><a target=\"https:\/\/venngage.com\/templates\/infographics\/nonprofit-conference-events-timeline-75da5470-758e-4fe4-b04b-ca11dc640050\"\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>CREA ESTA PLANTILLA INFOGR\u00c1FICA<\/b><\/button><\/a><\/p>\n\n\n\n<p>Las plantillas de calendario pueden ayudarte a ser extremadamente detallado, incluso hasta la hora. De nuevo, aunque este ejemplo se cre\u00f3 para un \u00fanico evento, es f\u00e1cilmente editable para cualquier proyecto o prop\u00f3sito de planificaci\u00f3n de eventos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Mejores pr\u00e1cticas para crear un cronograma de actividades efectivo<\/h2>\n\n\n\n<p>Para garantizar que tu cronograma de actividades cumpla su prop\u00f3sito de manera efectiva, es fundamental seguir ciertas mejores pr\u00e1cticas que optimicen su utilidad. Aqu\u00ed te compartimos algunas recomendaciones valiosas:<\/p>\n\n\n\n<p>Al crear el cronograma, aseg\u00farate de&nbsp;<strong>incluir a los miembros del equipo<\/strong>. Su perspectiva en la estimaci\u00f3n de tareas y plazos es invaluable y fomenta un fuerte sentido de compromiso. Ahora es momento de&nbsp;<strong>revisar y ajustar,<\/strong>&nbsp;recuerda que un cronograma no es un documento est\u00e1tico. Es crucial revisarlo regularmente y ajustarlo seg\u00fan el progreso del proyecto, asegur\u00e1ndote de que todos est\u00e9n al tanto de cualquier cambio.<\/p>\n\n\n\n<p>Es importante que&nbsp;<strong>priorices actividades<\/strong>, para ello, identifica las tareas m\u00e1s cr\u00edticas y ord\u00e9nalas por prioridad. Esto te permitir\u00e1 concentrarte en lo que realmente impulsa el avance del proyecto. Adem\u00e1s, ante todo&nbsp;<strong>establece tiempos realistas<\/strong>, para ello s\u00e9 honesto con las estimaciones de tiempo. Sobreestimar la capacidad del equipo puede llevar a incumplimientos y frustraciones.<\/p>\n\n\n\n<p>No olvides&nbsp;<strong>utilizar herramientas digitales<\/strong>&nbsp;que hay en el mercado. Estas pueden facilitar la creaci\u00f3n, seguimiento y ajustes del cronograma, adem\u00e1s de fomentar la colaboraci\u00f3n entre los miembros del equipo. En vez de depender de los hilos de correo electr\u00f3nico para hacer seguimiento del progreso, es m\u00e1s eficaz usar pizarras digitales que permiten actualizaciones en tiempo real y acceso centralizado a la informaci\u00f3n del proyecto.<\/p>\n\n\n\n<p>Finalmente, para que tu cronograma sea efectivo no olvides&nbsp;<strong>comunicar claramente<\/strong>, aseg\u00farate de que todos comprendan el cronograma, sus responsabilidades y los plazos. Una comunicaci\u00f3n efectiva minimiza malentendidos y promueve un ambiente de trabajo cohesivo.<\/p>\n\n\n\n<p>Siguiendo estas mejores pr\u00e1cticas, podr\u00e1s crear un cronograma de actividades que no solo sea efectivo, sino que tambi\u00e9n contribuya de manera significativa al \u00e9xito general de tus proyectos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>En resumen: Pon orden en el caos con plantillas de cronogramas de proyectos atractivas y eficaces para PowerPoint y Word<\/strong><\/h2>\n\n\n\n<p>Las capacidades integradas de PowerPoint y Word no est\u00e1n a la altura del importante y dif\u00edcil trabajo de la gesti\u00f3n de proyectos. Pero los usuarios de Venngage pueden tener lo mejor de ambos mundos creando hermosas l\u00edneas de tiempo para utilizarlas en sus programas favoritos.<\/p>\n\n\n\n<p>Puedes crear una cuenta en Venngage de forma gratuita, y probar las plantillas anteriores para ver cu\u00e1nto mejor son en comparaci\u00f3n con las l\u00edneas de tiempo creadas en PowerPoint y Word.<\/p>\n\n\n\n<p>Junto con nuestro editor de arrastrar y soltar, crear una l\u00ednea de tiempo del proyecto utilizando Venngage es pan comido, incluso si no tienes experiencia en dise\u00f1o.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><a href=\"https:\/\/infograph.venngage.com\/register\" target=\"_blank\" rel=\"noreferrer noopener\"><button class=\"btn-cta\" data-darkreader-inline-color=\"\" data-darkreader-inline-boxshadow=\"\" data-darkreader-inline-bgimage=\"\" data-darkreader-inline-bgcolor=\"\"><b>EMPIEZA A CREAR GRATIS<\/b><\/button><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cuando los proyectos descarrilan, a menudo se debe a una falta de organizaci\u00f3n. La mayor\u00eda de las empresas y gestores de proyectos conf\u00edan en los plazos de los proyectos. Desgraciadamente, las plantillas de cronograma de proyectos de muchas herramientas ofim\u00e1ticas comunes pueden limitar la creatividad y el compromiso del equipo. Un cronograma en blanco puede [&hellip;]<\/p>\n","protected":false},"author":33,"featured_media":8940,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[6,5,27],"tags":[41,42],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"\u00bfTe encanta PowerPoint y Word pero no sus herramientas de dise\u00f1o? Tenlo todo usando Venngage para crear cronogramsa de proyectos.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"+15 cronogramas de actividades editables para Word y PowerPoint\" \/>\n<meta property=\"og:description\" content=\"\u00bfTe encanta PowerPoint y Word pero no sus herramientas de dise\u00f1o? Tenlo todo usando Venngage para crear cronogramsa de proyectos.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/\" \/>\n<meta property=\"og:site_name\" content=\"Venngage Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Venngage\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-09T11:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-08T18:32:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/cronograma-de-actividades.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@venngage\" \/>\n<meta name=\"twitter:site\" content=\"@venngage\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jennifer Gaskin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/es.venngage.com\/blog\/#website\",\"url\":\"https:\/\/es.venngage.com\/blog\/\",\"name\":\"Venngage Blog\",\"description\":\"Venngage Infograf\\u00edas\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/es.venngage.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"es-ES\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#primaryimage\",\"inLanguage\":\"es-ES\",\"url\":\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/cronograma-de-actividades.png\",\"contentUrl\":\"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/cronograma-de-actividades.png\",\"width\":1024,\"height\":576},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#webpage\",\"url\":\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/\",\"name\":\"+15 cronogramas de actividades editables para Word y PowerPoint\",\"isPartOf\":{\"@id\":\"https:\/\/es.venngage.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#primaryimage\"},\"datePublished\":\"2024-08-09T11:00:00+00:00\",\"dateModified\":\"2024-08-08T18:32:59+00:00\",\"author\":{\"@id\":\"https:\/\/es.venngage.com\/blog\/#\/schema\/person\/f1b9fc209522fb32863a8ee1f149423f\"},\"description\":\"\\u00bfTe encanta PowerPoint y Word pero no sus herramientas de dise\\u00f1o? Tenlo todo usando Venngage para crear cronogramsa de proyectos.\",\"breadcrumb\":{\"@id\":\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#breadcrumb\"},\"inLanguage\":\"es-ES\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/es.venngage.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dise\\u00f1o gr\\u00e1fico\",\"item\":\"https:\/\/es.venngage.com\/blog\/category\/inspiracion\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"+15 plantillas de cronograma de actividades editables para usar en Word y PowerPoint\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/es.venngage.com\/blog\/#\/schema\/person\/f1b9fc209522fb32863a8ee1f149423f\",\"name\":\"Jennifer Gaskin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/es.venngage.com\/blog\/#personlogo\",\"inLanguage\":\"es-ES\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/56468fd08764a3f00fc8f0b38019650a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/56468fd08764a3f00fc8f0b38019650a?s=96&d=mm&r=g\",\"caption\":\"Jennifer Gaskin\"},\"url\":\"https:\/\/es.venngage.com\/blog\/author\/jennifer-gaskin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"\u00bfTe encanta PowerPoint y Word pero no sus herramientas de dise\u00f1o? Tenlo todo usando Venngage para crear cronogramsa de proyectos.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/","og_locale":"es_ES","og_type":"article","og_title":"+15 cronogramas de actividades editables para Word y PowerPoint","og_description":"\u00bfTe encanta PowerPoint y Word pero no sus herramientas de dise\u00f1o? Tenlo todo usando Venngage para crear cronogramsa de proyectos.","og_url":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/","og_site_name":"Venngage Blog","article_publisher":"https:\/\/www.facebook.com\/Venngage","article_published_time":"2024-08-09T11:00:00+00:00","article_modified_time":"2024-08-08T18:32:59+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/cronograma-de-actividades.png","type":"image\/png"}],"twitter_card":"summary","twitter_creator":"@venngage","twitter_site":"@venngage","twitter_misc":{"Written by":"Jennifer Gaskin","Est. reading time":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/es.venngage.com\/blog\/#website","url":"https:\/\/es.venngage.com\/blog\/","name":"Venngage Blog","description":"Venngage Infograf\u00edas","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/es.venngage.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"es-ES"},{"@type":"ImageObject","@id":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#primaryimage","inLanguage":"es-ES","url":"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/cronograma-de-actividades.png","contentUrl":"https:\/\/venngage-wordpress-es.s3.amazonaws.com\/uploads\/2023\/08\/cronograma-de-actividades.png","width":1024,"height":576},{"@type":"WebPage","@id":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#webpage","url":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/","name":"+15 cronogramas de actividades editables para Word y PowerPoint","isPartOf":{"@id":"https:\/\/es.venngage.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#primaryimage"},"datePublished":"2024-08-09T11:00:00+00:00","dateModified":"2024-08-08T18:32:59+00:00","author":{"@id":"https:\/\/es.venngage.com\/blog\/#\/schema\/person\/f1b9fc209522fb32863a8ee1f149423f"},"description":"\u00bfTe encanta PowerPoint y Word pero no sus herramientas de dise\u00f1o? Tenlo todo usando Venngage para crear cronogramsa de proyectos.","breadcrumb":{"@id":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#breadcrumb"},"inLanguage":"es-ES","potentialAction":[{"@type":"ReadAction","target":["https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/es.venngage.com\/blog\/cronograma-de-actividades\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/es.venngage.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Dise\u00f1o gr\u00e1fico","item":"https:\/\/es.venngage.com\/blog\/category\/inspiracion\/"},{"@type":"ListItem","position":3,"name":"+15 plantillas de cronograma de actividades editables para usar en Word y PowerPoint"}]},{"@type":"Person","@id":"https:\/\/es.venngage.com\/blog\/#\/schema\/person\/f1b9fc209522fb32863a8ee1f149423f","name":"Jennifer Gaskin","image":{"@type":"ImageObject","@id":"https:\/\/es.venngage.com\/blog\/#personlogo","inLanguage":"es-ES","url":"https:\/\/secure.gravatar.com\/avatar\/56468fd08764a3f00fc8f0b38019650a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/56468fd08764a3f00fc8f0b38019650a?s=96&d=mm&r=g","caption":"Jennifer Gaskin"},"url":"https:\/\/es.venngage.com\/blog\/author\/jennifer-gaskin\/"}]}},"_links":{"self":[{"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/posts\/5859"}],"collection":[{"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/users\/33"}],"replies":[{"embeddable":true,"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/comments?post=5859"}],"version-history":[{"count":8,"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/posts\/5859\/revisions"}],"predecessor-version":[{"id":8942,"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/posts\/5859\/revisions\/8942"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/media\/8940"}],"wp:attachment":[{"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/media?parent=5859"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/categories?post=5859"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/es.venngage.com\/blog\/wp-json\/wp\/v2\/tags?post=5859"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}